HOLLAND PARK- BASEMENT CONVERSION

Project Overview

HYB Construction successfully delivered a 400sqm, 10m-deep fully waterproofed basement with an integrated swimming pool for a private client in Holland Park, Kensington. The project required extensive basement construction expertise, precise coordination, and a high standard of structural finish to meet both engineering and architectural specifications.

Scope of Works

Our team managed every stage of the project, including:

  • Groundworks: Piling to support the basement walls and slab, full excavation with earth retention measures, and installation of a comprehensive drainage system featuring perimeter land drains and sump pumps to manage groundwater effectively.

  • Formwork: Constructed for decking, columns, and walls, ensuring structural accuracy and a smooth, durable concrete finish.

  • Steel Fixing: Delivered a fully reinforced concrete structure designed to support both the basement and swimming pool.

  • Basement Construction: Included temporary works, dewatering, and pouring waterproof concrete to achieve a robust, watertight structure.

Challenges & Solutions

Working within a tight residential footprint in Holland Park required careful planning to manage access, noise, and delivery schedules. HYB Construction implemented phased works and strict site logistics to maintain productivity while ensuring minimal disruption to neighbouring properties.

Outcome / Results

The project was completed on schedule and to specification, delivering a structurally sound and watertight basement ready for fit-out. HYB Construction’s expertise in basement construction, formwork, and steel fixing ensured a seamless build process and exceptional finish throughout.


HYB Construction Limited

Company number: 08648852

Unit 7, 6-8 Claremont Road, Business centre, Surbiton, Greater London, KT6 4QU

CONTACT US NOW

 

Member ID No. 5138596